Preparing The Machine For Freezing Temperatures
`
PR-105 PAVEMENT PROFILER
[KEBU0600]
MACHINE ARRANGEMENT
Anytime the machine is parked outside for a length of time in freezing weather without the spray system running, the water tank should be drained, the spray system water pump drained and the hoses drained of water.
Show/hide table
![]() |
INADVERTENT STARTING OF THE ENGINE CAN CAUSE PERSONAL INJURY. SHUT THE ENGINE DOWN AND REMOVE THE KEY FROM THE IGNITION SWITCH. |
![]() |
To prepare the machine for freezing temperatures:
- 1. Open the water tank drain valve and allow the water to drain. Close the drain valve.
- 2. Remove the bottom pipe plug in the water pump and allow the water to drain from the pump. Replace the pipe plug.
- 3. Disconnect the pump suction and pressure hoses from the water pump. Lower the hoses and allow any water to drain out.
- 4. Reconnect the hoses.
To prepare the spray system for operation after being drained:
- 1. Fill the water tank with water.
Show/hide table
![]() |
INADVERTENT STARTING OF THE ENGINE CAN CAUSE PERSONAL INJURY. SHUT THE ENGINE DOWN AND REMOVE THE KEY FROM THE IGNITION SWITCH. |
![]() |
- 2. Remove the topmost water pump pipe plug and allow water to flow from the port until the water is air-free.
- 3. Replace the pipe plug.
- 4. Connect the grease gun to the grease fitting and apply lubricant until resistance is felt on the grease gun handle.
- 5. Start the engine and check out operation of the spray system.
Information System:
PR-105 PAVEMENT PROFILER
During Operation
PR-105 PAVEMENT PROFILER
Starting Operation
PR-105 PAVEMENT PROFILER
Non-Operational Travel
PR-105 PAVEMENT PROFILER
Engine Starting Procedure
PR-105 PAVEMENT PROFILER
Travel
PR-105 PAVEMENT PROFILER
Major Machine Systems
PR-105 PAVEMENT PROFILER
Major Machine Components
PR-105 PAVEMENT PROFILER
If The Machine Is Serviced Well, It Will Provided Safe And Efficient Operation!
PR-105 PAVEMENT PROFILER
Be Sure Everyone Survives Your Operation!
CP-433B VIBRATORY COMPACTOR LEVELING BLADE
Testing And Adjusting
CP-433B VIBRATORY COMPACTOR LEVELING BLADE
Systems Operation
CP-433B & CS-433B VIBRATORY COMPACTORS SECONDARY/PARKING BRA
Testing And Adjusting
PR-105 PAVEMENT PROFILER
Service Data
PR-105 PAVEMENT PROFILER
Service As Required
PR-105 PAVEMENT PROFILER
10 Hour Service
PR-105 PAVEMENT PROFILER
50 Hour Service
PR-105 PAVEMENT PROFILER
150 Hour Service
PR-105 PAVEMENT PROFILER
400 Hour Service
PR-105 PAVEMENT PROFILER
500 Hour Service
PR-105 PAVEMENT PROFILER
1000 Hour Or Annual Service
PR-275 PAVEMENT PROFILER
Machine Components
PR-275 PAVEMENT PROFILER
Hydrostatic Transmissions
PR-275 PAVEMENT PROFILER
Hydra-Mation System
PR-275 PAVEMENT PROFILER
Engine And Propulsion