Be Sure Everyone Survives Your Operation!
`
PR-1000 PAVEMENT PROFILER
[KEBU0603]
MACHINE ARRANGEMENT
PR-1000 PAVEMENT PROFILER
Be Sure Everyone Survives Your Operation!
PR-1000 PAVEMENT PROFILER
If The Machine Is Serviced Well, It Will Provide Safe And Efficient Operation!
PR-1000 PAVEMENT PROFILER
General Description
PR-1000 PAVEMENT PROFILER
Major Machine Components
PR-1000 PAVEMENT PROFILER
Track Drive Hydraulic System
- 1. Have a first-aid kit handy. Use proper antiseptics on scratches, cuts, etc. immediately to avoid infection. LEARN WHERE TO GET PROPER MEDICAL SERVICE IF IT IS NEEDED.
- 2. Have a fire extinguisher handy, preferably mounted on the operator's platform.
- 3. Check to see that all personnel are clear of the machine before moving the machine. Sound the horn for several seconds to warn unobserved personnel and allow them time to clear the machine.
- 4. Never operate the machine under load until it is thoroughly warmed up - especially important with hydraulically operated equipment. Erratic machine responses may occur when the hydraulic oil is cold.
- 5. Lower the cutter SLOWLY when starting a cut, or the machine may ride up on the cutter and travel backwards some distance.
- 6. DO NOT LET ANYONE STAND BEHIND THE MACHINE WHILE IT IS IN OPERATION. If the cutter hits a solid obstruction, the machine may jump backwards.
- 7. Work slowly and carefully until you are accustomed to the machine, so that you will not get yourself into a situation you are not yet prepared to handle.
- 8. NEVER ALLOW A TRUCK TO HIT THE CONVEYOR. If a truck backs directly into the rear of the upper conveyor it can cause the conveyor structure or support members to fail immediately if the truck applies enough force. However, a seemingly minor contact by a truck can cause enough stress to start hairline cracks in the conveyor structure, support members and welds that will lead to a later failure.
- 9. Do not let anyone ride anywhere on the machine, not even for short distances. They could fall under the cutter or tracks or onto the conveyor.
- 10. Keep all personnel clear of the cutter, conveyors, and tracks when the engine is running.
- 11. If you must leave the machine unattended, lower the mainframe until the cutter is on the ground and shut the engine down. Be sure the travel control is at neutral and the parking brake on.
- 12. ALWAYS USE THE UPPER CONVEYOR SHIPPING SUPPORTS WHENEVER TRANSPORTING THE MACHINE. The high speed of operation and the heavy demand for the services of these machines lead to frequent transporting of the machines over highways and roads of varying quality. The normal bumping and rolling of the trailer causes high variable loads on the upper conveyor support, especially when travelling on rough roads. These high variable loads applied continuously over long transit times can cause fatigue cracks in the support welds and members that will cause structural failure at a later time.
- 13. Never show off, grandstand or engage in horseplay on the job.
- 14. Never use alcoholic beverages or illicit drugs on the job. Also, be careful of medicine, tranquilizers and other drugs that can cause sleepiness. The increased reaction time caused by any of these could cost your life.
- 15. Devote your full attention to the job. Even a slight distraction can be dangerous while operating a machine.
- 16. Let only authorized and responsible persons operate the machine. No inexperienced person should ever be allowed to operate the machine without proper training first.
- 17. Never try to service a moving machine. You could fall under the machine.
- 18. Never try to mount a moving machine. You could fall under the machine.
- 19. Never operate an unsafe machine. You or your friends and associates could be seriously injured.
Information System:
PR-450 PAVEMENT PROFILER
1,000 Hour Or Annual Service
PR-450 PAVEMENT PROFILER
300 Hour Service
PR-450 PAVEMENT PROFILER
200 Hour Service
PR-450 PAVEMENT PROFILER
150 Hour Service
PR-450 PAVEMENT PROFILER
100 Hour Service
PR-450 PAVEMENT PROFILER
50 Hour Service
PR-450 PAVEMENT PROFILER
Daily Or 10 Hour Service
PR-450 PAVEMENT PROFILER
Service Data
PR-450 PAVEMENT PROFILER
Transporting The Machine Between Job Sites
PR-450 PAVEMENT PROFILER
During Operation
PR-450 PAVEMENT PROFILER
Starting Operation
PR-450 PAVEMENT PROFILER
Preparing The Machine For Operation
PR-1000 PAVEMENT PROFILER
If The Machine Is Serviced Well, It Will Provide Safe And Efficient Operation!
PR-1000 PAVEMENT PROFILER
General Description
PR-1000 PAVEMENT PROFILER
Major Machine Components
PR-1000 PAVEMENT PROFILER
Track Drive Hydraulic System
PR-1000 PAVEMENT PROFILER
Control (Auxiliary) Hydraulic System
PR-1000 PAVEMENT PROFILER
Water Systems
PR-1000 PAVEMENT PROFILER
Compressed Air System
PR-1000 PAVEMENT PROFILER
Travel
PR-1000 PAVEMENT PROFILER
Steering And Elevation Control
PR-1000 PAVEMENT PROFILER
Cutter Engine (Engine A)
PR-1000 PAVEMENT PROFILER
Cutter
PR-1000 PAVEMENT PROFILER
Starting Procedure