Shutdown Procedure
`
PR-1000 PAVEMENT PROFILER
[KEBU0603]
MACHINE ARRANGEMENT
PR-1000 PAVEMENT PROFILER
Be Sure Everyone Survives Your Operation!
PR-1000 PAVEMENT PROFILER
If The Machine Is Serviced Well, It Will Provide Safe And Efficient Operation!
PR-1000 PAVEMENT PROFILER
General Description
PR-1000 PAVEMENT PROFILER
Major Machine Components
PR-1000 PAVEMENT PROFILER
Track Drive Hydraulic System
Show/hide table
![]() |
ALWAYS SHUT ENGINE A (AVSpare 3412) DOWN BEFORE SHUTTING DOWN ENGINE B (AVSpare 3208). NEITHER THE MACHINE CONTROLS NOR THE COOLING FAN WILL OPERATE UNLESS ENGINE B IS RUNNING. |
![]() |
NOTE: IF PARKING THE MACHINE, LOWER THE MAINFRAME EVENLY UNTIL THE CUTTER IS RESTING ON THE GROUND. IN FREEZING WEATHER PLACE BOARDS BETWEEN THE GROUND AND THE TRACKS SO THE TRACKS WILL NOT FREEZE TO THE GROUND.
- 1. Set all hydraulic system controls at "Off" or "N" (neutral).
- 2. Set the emergency and park brake control at "On".
- 3. Set the cutter clutch control at "Out".
- 4. Lower the mainframe evenly until the cutter is resting on the ground.
- 5. Set all accessory electrical system switches at "Off".
- 6. Run both engines at half speed for about 5 minutes to cool the engine.
- 7. Reduce both engines to low idle for about 30 seconds.
- 8. Move the engine A throttle lever to "Off".
- 9. Move the engine B throttle to full "Decrease".
- 10. Move the fuel and ignition switches to "Off".
Show/hide table
![]() |
ALWAYS SHUT THE MACHINE DOWN AS DESCRIBED ABOVE BEFORE LEAVING THE MACHINE. |
![]() |
- 11. Set the main battery disconnect switch at "Off" if the machine is being parked for overnight.
Information System:
PR-1000 PAVEMENT PROFILER
Starting Procedure
PR-1000 PAVEMENT PROFILER
Cutter
PR-1000 PAVEMENT PROFILER
Cutter Engine (Engine A)
PR-1000 PAVEMENT PROFILER
Steering And Elevation Control
PR-1000 PAVEMENT PROFILER
Travel
PR-1000 PAVEMENT PROFILER
Compressed Air System
PR-1000 PAVEMENT PROFILER
Water Systems
PR-1000 PAVEMENT PROFILER
Control (Auxiliary) Hydraulic System
PR-1000 PAVEMENT PROFILER
Track Drive Hydraulic System
PR-1000 PAVEMENT PROFILER
Major Machine Components
PR-1000 PAVEMENT PROFILER
General Description
PR-1000 PAVEMENT PROFILER
If The Machine Is Serviced Well, It Will Provide Safe And Efficient Operation!
PR-1000 PAVEMENT PROFILER
Non-operational Travel
PR-1000 PAVEMENT PROFILER
Preparing The Machine For Operation
PR-1000 PAVEMENT PROFILER
Starting Operation
PR-1000 PAVEMENT PROFILER
Transporting The Machine
PR-1000 PAVEMENT PROFILER
Service Data
PR-1000 PAVEMENT PROFILER
Controls And Systems For Servicing The Machine
PR-1000 PAVEMENT PROFILER
Service Chart
PR-1000 PAVEMENT PROFILER
Daily Or 10 Hour Service
PR-1000 PAVEMENT PROFILER
50 Hour Service
PR-1000 PAVEMENT PROFILER
100 Hour Service
PR-1000 PAVEMENT PROFILER
200 Hour Service
PR-1000 PAVEMENT PROFILER
250 Hour Service