Roading Operation
`
AP-800 ASPHALT PAVER
[KEBU0632]
AP-800 ASPHALT PAVER
Shutdown Procedure
AP-800 ASPHALT PAVER
Preparing The Machine For Paving Operation
MACHINE ARRANGEMENT
1.1. Preparing The Machine For Roading
2.1. Roading The Machine
Preparing The Machine For Roading
To prepare the machine for roading:
- 1. Adjust the width of the screed as necessary for the terrain to be traveled.
Show/hide table
NOTICE |
---|
REMOVE EITHER THE TOW POINT PINS OR THE TOW POINT CYLINDER PINS BEFORE RAISING THE SCREED OR DAMAGE MAY RESULT. |
- 2. Raise the screed and install the screed lift links.
- 3. Install any required flags, signals or lights.
- 4. Set the console selector switch to the desired console.
Roading The Machine
- 1. Start the engine as described on pages 4-2 and 4-3.
Show/hide table
![]() |
MOVING THE MACHINE BEFORE ALL PERSONNEL ARE CLEAR OF THE MACHINE COULD CAUSE PERSONAL INJURY. SOUND THE HORN FOR SEVERAL SECONDS BEFORE MOVING THE MACHINE. |
![]() |
- 2. After the water temperature gauge has begun to rise, set the transmission speed selection switch at "Travel", the motor speed selection switch at "Hi" and the engine at full speed.
- 3. Check that the speed selection control is at "Slow", then depress the brake pedal and move the park brake switch to "Off".
- 4. Move the power switch to "Go".
- 5. Slowly release the brake pedal while at the same time moving the speed selection control clockwise. When the desired speed is reached, release the speed selection control.
To slow or stop the machine:
- 1. Move the speed selection control counterclockwise until the desired speed is reached or until the control is at "Slow". Move the motor speed range selection switch to "Lo" if necessary.
Show/hide table
NOTICE |
---|
DO NOT MOVE THE DIRECTION SELECTOR SWITCH FROM ONE TRAVEL DIRECTION TO THE OTHER WITHOUT BRINGING THE MACHINE TO A COMPLETE STOP FIRST. THE MACHINE MUST BE BROUGHT TO A COMPLETE STOP BEFORE SHIFTING THE TRANSMISSION SPEED RANGES. |
- 2. If additional braking is required, depress the brake pedal.
Information System:
AP-800 ASPHALT PAVER
Shutdown Procedure
AP-800 ASPHALT PAVER
Starting Procedure
AP-800 ASPHALT PAVER
Screed
AP-800 ASPHALT PAVER
Both Control Panels
AP-800 ASPHALT PAVER
Automatic Screed Control Systems
AP-800 ASPHALT PAVER
Hydraulic Systems
AP-800 ASPHALT PAVER
Powerpack
AP-800 ASPHALT PAVER
Be Sure The Tiger Paws Are In Shape For Running!
AP-800 ASPHALT PAVER
If The Machine Is Serviced Well, It Will Provide Safe And Efficient Operation!
AP-800 ASPHALT PAVER
Be Sure Everyone Survives Your Operation!
WE-851B WINDROW ELEVATOR
Service When Required
WE-851B WINDROW ELEVATOR
2400 Hour Service
AP-800 ASPHALT PAVER
Preparing The Machine For Paving Operation
AP-800 ASPHALT PAVER
Paving Operation
AP-800 ASPHALT PAVER
Ending The Paving Operation
AP-800 ASPHALT PAVER
Paving Techniques
AP-800 ASPHALT PAVER
Service Data
AP-800 ASPHALT PAVER
Lubrication Chart
AP-800 ASPHALT PAVER
Daily Or 10 Hour Service
AP-800 ASPHALT PAVER
50 Hour Service
AP-800 ASPHALT PAVER
250 Hour Service
AP-800 ASPHALT PAVER
500 Hour Service
AP-800 ASPHALT PAVER
1000 Hour Or Annual Service
SS-250 SOIL STABILIZER
Operation