CP-563E, CP-573E, CS-563E, CS-573E and CS-583E Vibratory Soil Compactors Propel System Relief Valve (Main) - Test and Adjust Caterpillar


Relief Valve (Main) - Test and Adjust
`
1.1. Testing and Adjusting the Pressure of the Main Relief Valve
2.2. Introduction
3.2. Required Tools
4.2. Digital Pressure Indicator
5.2. Standard Tooling
6.2. Test Procedure
7.2. Adjusting Procedure

Testing and Adjusting the Pressure of the Main Relief Valve

Introduction

This test is designed to determine if the main relief valve is adjusted to the correct pressure setting.

------ WARNING! ------

Sudden movement of the machine or release of oil under pressure can cause serious injury to persons on or near the machine.

To prevent possible injury, perform the procedure that follows before testing and adjusting the hydraulic system.

----------------------


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products.

Dispose of all fluids according to local regulations and mandates.


Required Tools

Hydraulic test procedures may be performed using either one of the following test equipment:

  • Digital Pressure Indicator

  • Standard tooling

Digital Pressure Indicator




Illustration 1g00929269

Table 1 provides a list of the required tools if the 198-4240 Digital Pressure Indicator is used to perform the following test procedure.

Table 1
Required Tools
Digital Pressure Indicator    
Tool     Item     Part Number     Description     Qty    
A     A1     198-4234     Digital Pressure Indicator     1    
A2 198-4239     Pressure Sensor
0 - 69000 kPa (0 - 10000 psi)    
4    

Standard Tooling




Illustration 2g00929270



Illustration 3g00929271

Table 2 provides a list of the required tools if standard tooling is used to perform the following test procedure.

Table 2
Required Tools (Standard Tooling)    
Tool     Item     Part Number     Description     Qty    
B     B1     177-7860     Hose As     4    
6V-4143 Coupler 8    
B2 8T-0861     Pressure Gauge
0 - 60000 kPa (0 - 8700 psi)    
4    
6V-3989 Fitting 4    
C     -     4C-6500     Digital Thermometer     1    
D     D1     6V-9830     Cap As     1    
D2 6V-9509     Face Seal Plug     1    
E     E1     177-7860     Hose As     1    
E2 6V-4143     Coupler     2    

Test Procedure

The 198-4240 Digital Pressure Indicator was used in the following test.

Note: Perform the Relief Valve (Charge) - Test and Adjust before you conduct the Relief Valve (Main) - Test and Adjust.

Before you conduct the test procedure on the main relief valves, the following steps must be performed:

  • Place the propel control lever in NEUTRAL position.

  • Place the machine in position against a solid, stationary object such as a loading dock. The wheels may be blocked and the drum may be blocked instead of placing the machine against a stationary object.

  • Make sure that the parking brake is applied.




Illustration 4g00929276

Final drive planetary

(1) Brake line

  1. Remove brake line (1). Use Tool (D) to plug the brake line and cap the fitting for the brake line.



    Illustration 5g00945973

    Drum propel pump

  1. Connect Tool (E) between the X1 and X2 ports on the drum propel pump.



    Illustration 6g00929277

    Location of Propel Pumps

    (2) Reverse relief valve pressure tap for the axle propel pump

    (3) Reverse relief valve for the axle propel pump

    (4) Reverse relief valve for the drum propel pump

    (5) Reverse relief valve pressure tap for the drum propel pump

    (6) Forward relief valve pressure tap for the drum propel pump

    (7) Forward relief valve for the drum propel pump

    (8) Balance lines

    (9) Forward relief valve for the axle propel pump

    (10) Forward relief valve pressure tap for the axle propel pump

  1. Connect two Tools (A2) to pressure test ports (2) and (5) .

  1. Connect two Tools (A2) to pressure test ports (6) and (10) .



    Illustration 7g00929279

    Cutaway of The Propel Pump

    (3) Reverse relief valve

    (9) Forward relief valve

    (11) Locknut

    (12) Adjuster

    (13) Relief valve cartridge

  1. Loosen the adjusting locknut (11) on the pressure override relief valve. Turn adjuster (12) clockwise for one half of a turn. Tighten the locknut (11) .

  1. Release the parking brake.

  1. Move the switch for machine speed to the HIGH SPEED position.

  1. Start the machine and run the engine at high idle at 2310 ± 50 rpm. Check the hydraulic temperature with Tool (C) until the hydraulic oil temperature reaches 38°C (100°F).

  1. Move the propel control lever to the full FORWARD position. The pressure at pressure test port (10) should be 46450 ± 1000 kPa (6737 ± 145 psi) above charge pressure.

  1. If the relief valve pressure reading on the axle propel pump is not correct, the forward main relief valve (9) must be adjusted.

  1. If the forward relief valve setting is correct, move the propel control lever to the full REVERSE position. The pressure at pressure test port (2) should be 46450 ± 1000 kPa (6737 ± 145 psi).

  1. If the relief valve pressure reading on the axle propel pump is not correct, the reverse main relief valve (3) must be adjusted.

Adjusting Procedure




    Illustration 8g00929297

    Relief Valve Cartridge

    (13) Relief valve cartridge

    (14) Locking setscrew

    (16) Spindle (adjuster)

  1. If the forward relief valve pressure is not correct, the following steps must be done in order to adjust the main relief valves:

    1. Stop the engine.

    1. Remove the caps on the forward relief valves.

    1. Remove relief valve cartridge (13) from relief valve (9). Reinstall the caps on the relief valve, so the oil does not leak during the adjustment to the cartridges.

    1. Clamp the cartridge in a soft vise jaw. See the arrows in illustration 8. Loosen locking setscrew (14) with a 3 mm allen wrench.

    1. Use a 5 mm wrench to turn spindle (16). Turn the spindle clockwise in order to increase pressure. Turn the spindle counterclockwise in order to decrease pressure. One full revolution of spindle (16) equals 4400 kPa (638 psi).

    1. Tighten locking setscrew (14) .

    1. Remove the relief valve cartridge from the vise.

    1. Reinstall the relief valve cartridge into relief valve (9). Install the caps on the relief valves. Tighten to the torque specifications.

  1. Start the engine.

  1. Recheck the pressure at test port (10) .

  1. Stop the engine.

  1. Readjust the pressure override relief valve back to the original position. To readjust the pressure override relief valve, refer to Testing and Adjusting, "Relief Valve (Pressure Override)".

  1. Disconnect Tool (E) from the drum propel pump. Install Tool (E) to the X1 and X2 ports of the axle propel pump. Repeat the testing procedure and the adjusting procedure for the relief valves of the drum propel pump.

  1. When you finish the test for the axle propel pump, remove Tool (E) .

Information System:

CP-563E, CP-573E, CS-563E, CS-573E and CS-583E Vibratory Soil Compactors Propel System Relief Valve (Charge) - Test and Adjust
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0673 - FMI 02
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0672 - FMI 01
CB-534D and CB-564D Asphalt Compactors Eccentric Weight Housing Oil - Change
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0590 - FMI 09
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0585 - FMI 02
RM-350B Road Reclaimer/Soil Stabilizer Machine Systems Seat - Remove and Install
14H Motor Grader Power Train Transmission and Transfer Gears - Assemble
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0795 - FMI 06
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0795 - FMI 05
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0795 - FMI 03
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Power Train Integrated Braking System
CP-563E, CP-573E, CS-563E, CS-573E and CS-583E Vibratory Soil Compactors Propel System Relief Valve (Pressure Override) - Test and Adjust
CP-563E, CP-573E, CS-563E, CS-573E and CS-583E Vibratory Soil Compactors Propel System Pump Synchronization - Test and Adjust
CP-563E, CP-573E, CS-563E, CS-573E and CS-583E Vibratory Soil Compactors Propel System Piston Pump Neutral - Test and Adjust
2002/09/16 A New Temperature Switch is Used for the Axle Oil Cooler System {5073}
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0674 - FMI 02
TK711, TK721, TK722 and TK732 Track Feller Bunchers Hydraulic System Pilot Hydraulic System
TK711, TK721, TK722 and TK732 Track Feller Bunchers Hydraulic System Location of Hydraulic Components
14H Motor Grader 3176C Engine Supplement Radiator Guard and Support, Aftercooler, and Radiator - Install
247 and 257 Multi Terrain Loaders Power Train Piston Motor (Hydrostatic) - Install
IT38G Series II Integrated Toolcarrier and 938G Series II Wheel Loader MID 081 - CID 0675 - FMI 02
140H and 160H Motor Graders Engine Supplement Water Pump - Remove
140H and 160H Motor Graders Engine Supplement Water Pump - Install