Steering Clutch and Brake Control Valve - Install
`
587R Pipelayer Power Train
[RENR8246]
587R Pipelayer Power Train
Steering Clutch and Brake Control Valve - Remove
587R Pipelayer Power Train
Priority Valve - Remove
STEERING AND BRAKING SYSTEM
VALVE GP
583R Pipelayer Power Train
Steering Clutch and Brake Control Valve - Disassemble
583R Pipelayer Power Train
Steering Clutch and Brake Control Valve - Assemble
587R Pipelayer Power Train
Steering Clutch and Brake Control Valve - Remove
587R Pipelayer Power Train
Steering Clutch and Brake Control Valve - Install
1.1. Installation Procedure
Installation Procedure
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
A     | 138-7573     | Link Bracket     | 1     |
- Attach Tooling (A) and a suitable lifting device onto valve (7). Install steering clutch and brake control valve (7). The weight of steering clutch and brake control valve (7) is approximately 43 kg (95 lb). Install bolts (6). Tighten bolts (6) to a torque of 55 ± 7 N·m (40 ± 5 lb ft).
Show/hide table
![]() | |
Illustration 1 | g01389321 |
- Install bolt (5) .
Show/hide table
![]() | |
Illustration 2 | g01389320 |
- Position rods (3) and (4 ). Connect rods (3) and (4) .
Show/hide table
![]() | |
Illustration 3 | g01389319 |
- Install plate assembly (2) .
Show/hide table
![]() | |
Illustration 4 | g01389318 |
- Install plate assembly (1) .
Show/hide table
![]() | |
Illustration 5 | g01389315 |
End By: Install the seat. Refer to Disassembly and Assembly, "Seat - Install".
Information System:
541 Track Feller Buncher, 551 Track Feller Buncher and 552 Track Feller Buncher Machine Systems
Piston Pump Margin Pressure - Test
EquipmentManager User Guide
Manage Users
587R Pipelayer Power Train
Steering Clutch and Brake Control Valve - Remove
216B2, 226B2, 232B2, 236B2, 242B2 and 252B2 Skid Steer Loaders
Fuel System Primary Filter (Water Separator) Element - Replace
216B3, 226B3, 236B3, 242B3 and 252B3 Skid Steer Loaders, 247B3 and 257B3 Multi Terrain Loaders and 259B3 Compact Track Loader
Engine Oil and Filter - Change
770 and 772 Off-Highway Truck Hydraulic and Braking System
Brake System Air - Purge
Inspection and Salvage of Rear Wheel Spindles for Certain Off-Highway Trucks {4201, 4205}
216B3, 226B3, 236B3, 242B3 and 252B3 Skid Steer Loaders, 247B3 and 257B3 Multi Terrain Loaders and 259B3 Compact Track Loader
Cooling System Level - Check
216B3, 226B3, 236B3, 242B3 and 252B3 Skid Steer Loaders, 247B3 and 257B3 Multi Terrain Loaders and 259B3 Compact Track Loader
Cooling System Coolant Extender (ELC) - Add
216B2, 226B2, 232B2, 236B2, 242B2 and 252B2 Skid Steer Loaders
Operation Information
216B2, 226B2, 232B2, 236B2, 242B2 and 252B2 Skid Steer Loaders
Engine Starting
216B2, 226B2, 232B2, 236B2, 242B2 and 252B2 Skid Steer Loaders
Plate Locations and Film Locations
938H Wheel Loader and IT38H Integrated Toolcarrier Power Train
Output Transfer Gears
Installation of Improved Fuel Lines on Landfill Compactors{1274}
587R Pipelayer Power Train
Priority Valve - Remove
3412E Engine for Caterpillar Built Machines
Diagnostic Trouble Code List
2007/06/25
New Bolts and Washers Are Now Used to Retain the Suspension Arms {7271}
Procedure to Rework Felling Head Frame{6319}
Installation of Improved Walkways on 793C and 793C XQ Off-Highway Trucks{7254, 7255, 7256}
24M Motor Grader Power Train Electronic Control System
MID 027 - CID 2734 - FMI 03
24M Motor Grader Power Train Electronic Control System
MID 027 - CID 2734 - FMI 04
587R Pipelayer Power Train
Priority Valve - Install
EquipmentManager Dealer Administrator Manual
Product Link Installation
587R Pipelayer Power Train
Priority Valve - Disassemble