Priority Valve - Assemble
`
587R Pipelayer Power Train
[RENR8246]
587R Pipelayer Power Train
Priority Valve - Disassemble
587R Pipelayer Power Train
Transmission and Bevel Gears - Remove
POWER TRAIN
VALVE GP-PRIORITY
587R Pipelayer Power Train
Priority Valve - Remove
587R Pipelayer Power Train
Priority Valve - Install
587R Pipelayer Power Train
Priority Valve - Disassemble
587R Pipelayer Power Train
Priority Valve - Assemble
1.1. Assembly Procedure
Assembly Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-1853     | Retaining Ring Pliers     | 1     |
- Install ball (20), spring (19), and retainer (18) into spool (12) .
Show/hide table
![]() | |
Illustration 1 | g01389771 |
Show/hide table
![]() | |
Illustration 2 | g01389720 |
Show/hide table
![]() |
Personal injury can result from being struck by parts propelled by a released spring force. Make sure to wear all necessary protective equipment. Follow the recommended procedure and use all recommended tooling to release the spring force. |
![]() |
- Use Tooling (A) in order to install retaining ring (17). Install retaining ring (17). Install slug (16) .
- Install spacers (13), spring (14), and spring (15) into spool assembly (12). Install spool assembly (12) .
- Install cover (11). Install bolts (10) .
Show/hide table
![]() | |
Illustration 3 | g01389719 |
Show/hide table
![]() |
Personal injury can result from being struck by parts propelled by a released spring force. Make sure to wear all necessary protective equipment. Follow the recommended procedure and use all recommended tooling to release the spring force. |
![]() |
- Install washers (6), lever assembly (7), washer (9), and cotter pin (8) .
Show/hide table
![]() | |
Illustration 4 | g01389714 |
- Install washer (4), lever assembly (5), washer (3), and cotter pin (2) .
Show/hide table
![]() | |
Illustration 5 | g01389710 |
- Install O-ring seals (1) .
Show/hide table
![]() | |
Illustration 6 | g01389699 |
End By: Install the priority valve. Refer to Disassembly and Assembly, "Priority Valve - Install".
Information System:
587R Pipelayer Power Train
Priority Valve - Disassemble
EquipmentManager Dealer Administrator Manual
Product Link Installation
587R Pipelayer Power Train
Priority Valve - Install
24M Motor Grader Power Train Electronic Control System
MID 027 - CID 2734 - FMI 04
24M Motor Grader Power Train Electronic Control System
MID 027 - CID 2734 - FMI 03
Installation of Improved Walkways on 793C and 793C XQ Off-Highway Trucks{7254, 7255, 7256}
Procedure to Rework Felling Head Frame{6319}
2007/06/25
New Bolts and Washers Are Now Used to Retain the Suspension Arms {7271}
3412E Engine for Caterpillar Built Machines
Diagnostic Trouble Code List
587R Pipelayer Power Train
Priority Valve - Remove
Installation of Improved Fuel Lines on Landfill Compactors{1274}
938H Wheel Loader and IT38H Integrated Toolcarrier Power Train
Output Transfer Gears
C4.4 and C6.6 Engines for Caterpillar Built Machines
System Overview
C4.4 and C6.6 Engines for Caterpillar Built Machines
Glossary
AP655D Asphalt Paver Machine Systems
Hydraulic Tank - Remove and Install
16M Motor Grader Power Train
Service Brake (Wheel Spindle) - Remove
16M Motor Grader Power Train
Service Brake (Wheel Spindle) - Install
AP655D and BG655D Asphalt Pavers Machine Systems
Steering Column - Disassemble
AP655D and BG655D Asphalt Pavers Machine Systems
Steering Column - Assemble
16M Motor Grader Power Train
Housing (Tandem) - Remove and Install
C4.4 and C6.6 Engines for Caterpillar Built Machines
Sensors and Electrical Connectors
16M Motor Grader Power Train
Rear Axle, Differential and Final Drive - Remove
16M Motor Grader Power Train
Rear Axle, Differential and Final Drive - Install
C4.4 and C6.6 Engines for Caterpillar Built Machines
Engine Wiring Information