587R Pipelayer Power Train Transmission and Bevel Gears - Install Caterpillar


Transmission and Bevel Gears - Install
`
1.1. Installation Procedure

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     FT-1897     Bracket As     1    
138-7575 Link Bracket     1    
8S-9089 Bolt     1    
1D-4719 Full Nut     1    
B     5J-0490     Bolt     1    
C     4C-6486     Stand     1    
8S-7611 Tube     1    
8S-8048 Saddle     1    
8S-7615 Pin     1    
D     138-7574     Link Bracket     2    
E     1U-9200     Lever Puller Hoist     2    
138-7575 Link Bracket     2    



    Illustration 1g01390602

  1. Attach Tooling (D) and a suitable lifting device onto transmission and bevel gear (12). The weight of transmission and bevel gear (12) is approximately 907 kg (2000 lb).



    Illustration 2g01390607

  1. Position transmission and bevel gear (12) into the frame. Install Tooling (A). Place Tooling (A) onto Tooling (C) .



    Illustration 3g01390602

  1. Remove Tooling (D) .



    Illustration 4g01390234

  1. Attach a suitable lifting device onto Tooling (A) .



    Illustration 5g01390719

  1. Attach Tooling (E) onto transmission and bevel gear (12) .

  1. Lift Tooling (A) in order to remove Tooling (C). Use Tooling (E) in order to move transmission and bevel gear (12) into position.



    Illustration 6g01390235

  1. Install bolts (13) into transmission and bevel gear (12). Do not move bolts (14) .



    Illustration 7g01390234

  1. Remove the suitable lifting device and Tooling (A) .



    Illustration 8g01390227

  1. Install cover (11) .



    Illustration 9g01390213

  1. Position cable assemblies (8) and (10). Install bolts (7) and (9) .



    Illustration 10g01390209

  1. Install pin assemblies (5) and (6) .



    Illustration 11g01390206

  1. Install cover (4) .



    Illustration 12g01390205

  1. Install plate (3). Install bolts (2). Install yoke (1) .