1.1. Removal Procedure
2.1. Installation Procedure (Electric Fuel Priming Pump)

Removal Procedure


NOTICE

Ensure that all adjustments and repairs that are carried out to the fuel system are performed by authorized personnel that have the correct training.

Before beginning ANY work on the fuel system, refer to Operation and Maintenance Manual, "General Hazard Information and High Pressure Fuel Lines" for safety information.

Refer to System Operation, Testing and Adjusting, "Cleanliness of Fuel System Components" for detailed information on the standards of cleanliness that must be observed during ALL work on the fuel system.



NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Dispose of all fluids according to local regulations and mandates.





    Illustration 1g01334857

    Typical example

  1. Turn the fuel supply to the OFF position.

  1. Turn the battery disconnect switch to the OFF position.

  1. Disconnect harness assembly (2) for electric priming pump (4) .

  1. Make a temporary identification mark on plastic tube assemblies (1) and (3) in order to show the correct position of the tube assemblies.

  1. Disconnect plastic tube assemblies (1) and (3) . Plug the tube assemblies with new plugs. Cap the ports in fuel priming pump (4) with new caps.

  1. Remove bolts (5) from electric priming pump (4) .

  1. Remove electric priming pump (4) from the mounting bracket.

Installation Procedure (Electric Fuel Priming Pump)


NOTICE

Ensure that all adjustments and repairs that are carried out to the fuel system are performed by authorized personnel that have the correct training.

Before beginning ANY work on the fuel system, refer to Operation and Maintenance Manual, "General Hazard Information and High Pressure Fuel Lines" for safety information.

Refer to System Operation, Testing and Adjusting, "Cleanliness of Fuel System Components" for detailed information on the standards of cleanliness that must be observed during ALL work on the fuel system.


  1. Ensure that electric priming pump (4) is clean and free from wear or damage. If necessary, replace the electric priming pump.



    Illustration 2g01334857

    Typical example

  1. Position electric priming pump (4) on the mounting bracket. Install bolts (5) to electric priming pump (4) .

  1. Tighten bolts (5) to a torque of 9 N·m (79 lb in).

  1. Remove the plugs from the plastic tube assemblies. Remove the caps from the electric priming pump.

  1. Connect plastic tube assemblies (1) and (3) to electric priming pump (4) .

    Note: Ensure that the plastic tube assemblies are installed in the original positions.

  1. Connect harness assembly (2) for electric priming pump (4) .

  1. Turn the fuel supply to the ON position.

  1. Turn the battery disconnect switch to the ON position.

  1. Prime the fuel system. Refer to Operation and Maintenance Manual, "Fuel System - Prime".

Information System:

AP655D and BG655D Asphalt Pavers Propel System Piston Pump (Propel) - Steel Track Machine
24M Motor Grader Power Train Transmission Lubrication
AP655D and BG655D Asphalt Pavers Propel System Location of Hydraulic Components (Propel System) - Steel Track Machine
3412E Engine for Caterpillar Built Machines Timing - Calibrate
AP655D and BG655D Asphalt Pavers Propel System General Information (Propel System) - Steel Track Machine
C15 and C18 Generator Set Engines Radiator Core - Remove and Install - Charge Air
3412E Engine for Caterpillar Built Machines Pressure Sensor - Calibrate
AP655D and BG655D Asphalt Pavers Machine Systems Hydraulic Schematic (Auxiliary Hydraulic System) - Steel Track Machine
259B3 Compact Track Loader, 247B3 and 257B3 Multi Terrain Loaders and 216B3, 226B3, 236B3, 242B3 and 252B3 Skid Steer Loaders Power Train Control Manifold and Solenoid (Parking Brake) - Remove and Install
587R Pipelayer Machine Systems Boom Winch Motor - Install
587R Pipelayer Machine Systems Boom Winch Motor - Remove
587R Pipelayer Machine Systems Accumulator - Remove and Install
2007/07/09 New Installation Sleeves for the Transmission Clutches Are Now Available {0720, 3030, 3155}
AP600D, AP655D, BG600D and BG655D Asphalt Pavers MID 082 - CID 0967 - FMI 02
AP600D, AP655D, BG600D and BG655D Asphalt Pavers MID 156 - CID 0967 - FMI 02
AP600D, AP655D, BG600D and BG655D Asphalt Pavers MID 157 - CID 0967 - FMI 02
259B3 Compact Track Loader, 247B3 and 257B3 Multi Terrain Loaders and 216B3, 226B3, 236B3, 242B3 and 252B3 Skid Steer Loaders Power Train Idler Axle - Disassemble
160M and 160 Motor Grader Machine Systems Bank Valve - Remove - Rear Frame
AP655D and BG655D Asphalt Pavers Propel System Piston Motor (Propel) - Steel Track Machine
C15 and C18 Generator Set Engines Radiator Top Tank - Remove and Install - Charge Air
2007/07/02 New Routing of Wiring Harness for Pressure Sensor {1408, 5057, 6543}
C15 and C18 Generator Set Engines Radiator Bottom Tank - Remove and Install - Charge Air
2007/08/06 Radiator and Hydraulic Oil Coolers Have Been Improved {1351}
C4.4 and C6.6 Engines for Caterpillar Built Machines Low Power/Poor or No Response to Throttle